Shutdown Safety


Safety under pressure.


Before shutdown


• Risk assessment & planning

• HSE coordination with client teams

• Shutdown-specific method statements


During shutdown


• Active field supervision & hazard monitoring

• Permit-to-work (PTW) execution

• LOTO verification & enforcement

• Confined space monitoring

• Lifting operation supervision

• SIMOPS coordination


After shutdown


• Return-to-service verification

• Site demobilization HSE checks

• Lessons learned documentation


RAMS / JHA

Detailed risk assessments and job hazard analyses tailored to shutdown scope.


PTW

Permit-to-work system management and validation throughout the shutdown period.


LOTO

Lockout/Tagout procedures ensuring energy isolation before maintenance activities.


Confined Space

Confined space entry supervision, atmospheric testing, and rescue readiness.


Lifting

Lifting operation planning, supervision, and compliance verification.


SIMOPS

Simultaneous operations coordination to prevent conflicting activities.


Contractor Control

Contractor HSE pre-qualification, induction, and performance monitoring.


Lessons Learned

Post-shutdown HSE review, findings capture, and continuous improvement tracking.